Removed raised-floor materials nand metal frames used for a server room.
After reparing corroded and cracled walls, painted them in white.
Put down carpet tiles according to the floor plan.
Power distribution, TV anttena, and Lan cable works.
Collapsible furnitures were deliverd. Assembled tatami mats and bookshelfs.
Notebook PCs and a refrigerator arrived.
Assenbled desks and set up the PCs.