May 7, 2014

         Puttied up cracks on the wall. Put protective sheet for window.

May 9, 2014

      Painting after scribbling on the wall.

May 14, 2014

      Painted ransoms and removed old carpet tiles.

May 15, 2014

         Put down new carpet tiles from entrance side.

      Installing a floor box is trablesome task.

         Put the last tile.

May 21, 2014

      Office desks arrived. Read instructions carefully before assembling the desks.

         Finished!

May 28, 2014

      Strage racks arrived.

      Buileded up the racks.

May 2, 2014

   Shield box arrived.

May 9, 2014

   All furniture were derriverd and assembeld.