Satoh Laboratory>Facility>Room 618>Renovating Room 618

Renovating Room 618

Floor Plan

May 9, 2013

         Removed raised-floor materials nand metal frames used for a server room.

June 28, 2013

         After reparing corroded and cracled walls, painted them in white.

Jun 30, 2013

      Put down carpet tiles according to the floor plan.

July 2, 2013

      Power distribution, TV anttena, and Lan cable works.

July 11, 2013

      Collapsible furnitures were deliverd. Assembled tatami mats and bookshelfs.

      Assembled office chairs.

July 16, 2013

      Notebook PCs and a refrigerator arrived.

      Assenbled desks and set up the PCs.

August 2, 2013

   A 60-inch LCD TV arrived.

December, 2013

      Happy Xmas party.